3/20 Weekly Work

Session Number 5
Week Number 1
Total Estimated Hours Contributed this Week: 4
What was your overall goal for this week? Organizing our pre production plan with research and studying other works.

Work Tasks 

Date Task Description Time Spent Was this a Best Practice? 
3/20WATCHED SHORT FILMS40 minutes We studied other peoples works.
3/21 Brainstorm/Pre Planning55 minutes yes
 3/22 Brainstorm30 minutes yes
3/23  Mood Board55 minutes  We made our mood board to create a visual rough draft story plan.
 3/24 Film Schedule 55 minutes yes

Preparing a Film Pitch TEMPLATE

LOGLINE

  • A group of friends find an old board game that sucks them into a different dimension and they have to beat the game to escape it

PROTAGONIST

  • group of friends
  • ~4 or 5 of them
  • different personalities

PROTANGIONST CORE WOUND / MOTIVATION 

  • Escaping the game

GENRE

  • Adventure/Thriller
  • Jumanji

PLOT DESCRIPTION

  • It starts with a friends a group of friends hanging out in one of the friends grandparents house, find old board game in basement/or attic. The game is mysterious, sucks them into a different dimension, in order to escape, they have to beat multiple challenges while also facing mysterious creatures and oppositions. they meet people that will help them. finally beat the last “level” and escape.

TREATMENT

Normal highschool friend group, different characteristics, dress differently.

INFLUENCES and EXAMPLES

  • Joe Kasdan
  • They have to open the box to get to the next “level” and its guarded by a black mamba, discussion on who should open it, finally decided who opens it